Symobo provided a complete approach. The existing building was first carefully moved to make way for the new building. In a later phase, the old building was completely removed. In the meantime, we built a brand new, one-storey modular building in no time. No less than 24 units and 2 outdoor staircases were installed with the utmost precision and brought together into a modern and sustainable whole.
The new building includes:
- Spacious and practical administrative offices
- Fully equipped sanitary areas
- Comfortable changing rooms with lockers
- Complies with all current standards for ventilation, fire safety and energy performance
From the first meetings, there was confidence in Symobo's expertise. This resulted in a smooth project progress, from first contact to completion. The result is therefore certainly there: a sustainable, functional building that perfectly meets the needs of the customer.
“During the operational preparations and works, everything was very structured. The logistical planning was prepared down to the last detail, so that the installation of the modules and the finishing went very smoothly.” - Hans, Symobo project manager